by Jason Hale | Sep 1, 2020
OBJECTIVES KEY...
by mwatson.ca | Jun 24, 2020
When a large warehouse became the anchor in an industrial development, the owners realized a reliable water source was needed for fire protection. Their bid was answered by Greatario and construction on a fire water tank was completed in 2014. Greatario supplied and...
by mwatson.ca | Jun 24, 2020
During construction, the Detour Gold mine was on track to become the largest operating gold mine in Canada. An operation of this magnitude required a cover structure to meet demand. Greatario responded to a bid from Detour Gold for a stockpile containment solution....
by mwatson.ca | Jun 15, 2020
A state-of-the-art drinking water treatment facility was built for the residents of Saint John, New Brunswick. This new facility improves the water quality over the former Latimer Lake Facility. It is capable of producing 75 million-liters of drinking water each day....
by mwatson.ca | Jun 15, 2020
During a scheduled tank inspection, it was found that a large amount of sediment had collected at the bottom of the tank. This sediment deposit was due from the water source and was thick enough to hinder a complete inspection of the tank floor. The Greatario Service...